Guides
How to specify a server rack
Start with the equipment, not the cabinet. Record equipment depth, weight, mounting format and cable access. Confirm usable internal space with the model drawing.
Then review the room layout. Door opening, maintenance access and containment interfaces should be checked together.
Send quantities, installation location and required delivery date with your layout. Ask for model-specific drawings and agreed inspection criteria.
Final configuration, performance, applicable requirements and delivery are defined in the agreed project specification.
Discuss your project
